KIMS Rubber Cambodia Natural Rubber Drying and Automatic Packaging Project

Tboung Khmum, Cambodia

The trolley interval is 320 seconds, with actual capacity reaching 5.36 t/h.

KIMS Rubber Cambodia Natural Rubber Drying and Automatic Packaging Project

Cambodian Prime Minister Hun Manet visits the automatic packaging line at Meilan KIMS RUBBER factory

10 t/hCombined Design Capacity of Two Drying Lines
17 kg per compartmentStandard Trolley Load
320 s per trolleyTrolley Interval
5.36 t/hActual Capacity

Project context

Project Scope and Feedstock Conditions

Using cup lump with approximately 30%–40% moisture, the project includes two biomass-heated drying lines and one automatic bale unloading and packaging line for TSR 10 production.

Project location:Tboung Khmum, Cambodia
Project timeline:Started Jan 2025 | Installed Nov 2025–Apr 2026 | Commissioned May 2026

Sinyoung scope

Sinyoung Equipment Scope

  • Rubber dryer: dries rubber crumbs.
  • Biomass steam boiler: supplies heat to the drying process.
  • Bale unloading robot: automatically removes rubber blocks from drying trolleys.
  • Dual-chamber baling press: compresses dried rubber into standard bales.
  • Exhaust treatment tower: treats drying exhaust.
  • Automatic bale internal inspection machine: cuts bales for internal white-spot inspection.
  • Bale inverter: rotates bales for external inspection.
  • Automatic wrapping machine: seals the bale in an inner film bag.

Project results

Project Parameters and Calculation

The trolley interval is 320 seconds, with actual capacity reaching 5.36 t/h.

Trolley Interval: 320 s/trolley;Actual Capacity 5.36 t/h

Project media

On-Site Images and Video

Rubber Dryer Overview
Rubber Dryer Overview
Automatic Bale Unloading Overview
Automatic Bale Unloading Overview
Boiler Installation
Boiler Installation
Single-Bale Weight
Single-Bale Weight
Drying-line operating parameter: 320-second trolley interval
Drying-line operating parameter: 320-second trolley interval
Automatic Bale Unloading Video
Automatic Wrapping Video
Stable Drying Temperature

Project inquiry

Tell us about your rubber processing project

Share your feedstock, target output, finished-rubber specification, energy conditions, and required automation. The form prepares an email to our engineering sales team; no form data is stored on this website.

  • Natural rubber TSR 10/20 production lines
  • Automatic natural rubber baling and packaging
  • Synthetic rubber and EPDM baling systems

Prefer to write directly? [email protected]