Meilan Group Côte d’Ivoire Plant 3 Natural Rubber Line Project

San-Pédro, Côte d’Ivoire

Both lines operate at a 330-second trolley interval, with actual capacity reaching 5.24 t/h per line.

Meilan Group Côte d’Ivoire Plant 3 Natural Rubber Line Project
2 linesComplete TSR Lines
5 t/hDesign Capacity per Line
330 s per trolleyTrolley Interval for Both Lines
5.24 t/hActual Capacity

Project context

Project Scope and Feedstock Conditions

Cup lump with approximately 30%–40% moisture requires preparation, kneading, creping, and granulation to improve dewatering and crumb form before drying.

Project location:San-Pédro, Côte d’Ivoire
Project timeline:Started Aug 2023 | Installed Apr–Sep 2024 | Commissioned Oct 2024

Sinyoung scope

Sinyoung Equipment Scope

  • Preparation wet prebreaker: prepares incoming feedstock.
  • Wet prebreaker: breaks, kneads, and mechanically dewaters rubber.
  • Creper and shredder: provide two-stage creping and granulation to form uniform crumbs suitable for drying.
  • Four-hotspot drying equipment: dries rubber crumbs.
  • Dual-chamber baling press: compresses dried rubber into standard bales.

Project results

Project Parameters and Calculation

Both lines operate at a 330-second trolley interval, with actual capacity reaching 5.24 t/h per line.

Trolley Interval: 330 s/trolley;Actual Capacity 5.24 t/h

Project media

On-Site Images and Video

Four-Hotspot Drying Cabinet
Four-Hotspot Drying Cabinet
330-Second Trolley Interval
330-Second Trolley Interval
Thorough Kneading by the Wet Prebreaker
Thorough Kneading by the Wet Prebreaker
Cut-Bale Inspection with No Underdried White Spots
Cut-Bale Inspection with No Underdried White Spots
Product Inspection Record (P0, P30, PRI)
Product Inspection Record (P0, P30, PRI)
Wet-Line Trial Production
First Trolley of Finished Product

Project inquiry

Tell us about your rubber processing project

Share your feedstock, target output, finished-rubber specification, energy conditions, and required automation. The form prepares an email to our engineering sales team; no form data is stored on this website.

  • Natural rubber TSR 10/20 production lines
  • Automatic natural rubber baling and packaging
  • Synthetic rubber and EPDM baling systems

Prefer to write directly? [email protected]