Project context
Project Scope and Feedstock Conditions
The project processes cup lump with approximately 30%–40% moisture. Sinyoung supplied feedstock preparation, wet breaking and mechanical dewatering, two-stage creping and granulation, four-hotspot drying equipment, and dual-chamber baling presses as an integrated TSR production system.
Related machinery for this project: TSR 10/20 natural rubber processing machinery and production line.
Project location:San-Pédro, Côte d’Ivoire
Project timeline:Started Aug 2023 | Installed Apr–Sep 2024 | Commissioned Oct 2024