Project context
Project Scope and Feedstock Conditions
The project processes high-moisture cup lump through wet breaking and kneading, two-stage creping, two-stage granulation, controlled trolley drying, and baling. The equipment sequence supports continuous feeding, uniform crumb preparation, and stable production at the documented trolley interval.
Related machinery for this project: TSR 10/20 natural rubber processing machinery and production line.
Project location:Zagné, Côte d’Ivoire
Project timeline:Started Jan 2025 | Installed Jul–Oct 2025 | Commissioned Dec 2025

