
Weighing Hopper
weighing hopper
Meters a defined rubber charge into the baling press.
Sinyoung supplies synthetic rubber balers and downstream packaging systems configured for the rubber form, bale weight, packaging specification, target cycle, and plant interface. A project may combine metered feeding or weighing, hydraulic baling, film wrapping, automatic bagging, metal inspection, conveying, and robotic palletizing.
This page covers synthetic-rubber baling and packaging after the upstream production process. It does not claim polymerization or synthetic-rubber drying-system supply unless those items are confirmed in a specific project scope.

weighing hopper
Meters a defined rubber charge into the baling press.

single-chamber baling press
Compresses loose rubber material into a specified bale.

Automatic wrapping machine
Seals each rubber bale in plastic film.

Automatic bagging machine
Picks a bag, inserts a bale into a woven or paper bag, and closes the bag automatically.

metal detector
Detects metal inside rubber bales while the bales travel on a belt conveyor.

palletizing robot
Stacks rubber bales on pallets or loads them into large boxes with a dedicated gripper.
Feeding and press configuration are selected after the rubber form, bulk density, temperature, flow behavior, target bale weight, and bale dimensions are confirmed.
Film wrapping, woven or paper bagging, closing, metal inspection, palletizing, or large-box loading can be configured to the finished-bale and logistics specification.
Engineering reviews upstream discharge rate, material condition, control signals, buffer requirements, downstream logistics, utilities, and available floor space.
Review Sinyoung's manufacturing capability, patents, quality controls, and international project support.
The baler and feeding system are selected after the rubber form, bulk density, temperature, flow behavior, target bale weight, and upstream discharge method are confirmed.
The project can use metered feeding or weighing matched to the rubber form and required tolerance. The final method is defined together with the press cycle and upstream material flow.
Yes. Film wrapping, woven or paper bagging, closing, inspection, and downstream handling can be combined when required by the finished-bale and logistics specification.
Yes. The upstream discharge rate, signal interface, material temperature and form, available space, and buffer requirements must be reviewed during engineering.
Please provide the rubber form, bulk density, temperature, target bale weight and dimensions, hourly or annual output, packaging material, inspection requirements, plant layout, utilities, and upstream interface.
Project inquiry
Share your feedstock, target output, finished-rubber specification, energy conditions, and required automation. Information sent through this form is delivered to our engineering sales team and handled under our Privacy Policy.
Prefer to write directly? [email protected]